Burlington Canal Lift Bridge

Live status inferred from AIS vessel traffic

CONNECTING…

Waiting for the AIS feed

Red corridor: a vessel lined up in it forces BRIDGE UP. Flashing dot: where a moving ship should be now, carried forward from its last report along the dotted line (up to 5 min).

○ Connecting…

Waiting for first AIS reports…